DIXON HOUSE

Originally built in 1901 Dixon House is a Grade II listed office building in the City of London EC3. The building  was refurbished in line with the designs of Fletcher Priest Architects. ISG carried out the £16.9m office refurbishment and of the façade of this 120 year old building. The reception area was opened up and two additional floors added on top. EDSI supplied a mix of doorsets including fully painted & oak veneered alongside bookmatched veneered panelling to the reception areas.

  • EDSi Supplied

    • FACTORY PAINT FINISHED ,LAMINATE & VENEERED DOORSETS
    • TIMBER SIDE SCREENS & VENEERED BOOKMATCHED PANELING
    • ALL MANUFACTURING IN-HOUSE AT OUR WORKS, NO THIRD PARTY
    • ALL CERTIFICATION UNDER THE Q MARK SCHEME
  • Why EDSi?

    • PRIVATELY OWNED FOR 30 YEARS
    • STRONG NET WORTH & BALANCE SHEET
    • ALL MANUFACTURING IN-HOUSE AT OUR WORKS, NO THIRD PARTY
    • ROBUST CURRENT CERTIFICATION
    • DIRECTORS FULLY VISIBLE & ENGAGED IN THE INDUSTRY, MD PAUL BAILEY PAST PRESIDENT OF THE BWF